Project Videos

Ground Floor Shuttering.

Ground Floor Slab Casting.

1st Floor Column Casting.

Ist Floor Beam Shuttering.

1st Floor Slab Rod Binding.

1st Floor Slab Casting on 27-01-2020.

2nd Floor Slab Rod Binding.

2nd Floor Slab Casting on 25-02-2020.

1st Floor Brick Working.

3rd Floor Column Casting.

3rd Floor Slab Casting on 12-07-2020